In real working conditions, engines are operated with differing loads and are seldom fully utilised.
To enable analysis of engine characteristics in the partial load range, five additional PTO measurement points were developed and introduced many years ago in cooperation with the industry and trade magazines. In addition to measurements of the full load and the governor control curves, they have become an obligatory part of power and fuel consumption testing according to the OECD Standard Code. The points represent the operating points as they often occur under true field conditions and enable comparisons of absolute and specific fuel consumption in the partial load range.







